Skip to main content

Completed Projects

  • UTC0904 “Quality of Life in Cache Valley Study,” Dr. Kevin Heaslip, PI. Funded by UTC. 

  • UTC0705 “Logan Bluff Landslide Risk Analysis,” Dr. James Bay, PI.  Funded by UDOT.

  • UTC0704 “Failure Modes Analysis of UDOT’s MSE Wall Inventory,” Dr. James Bay, PI.  Co-funded by UDOT.

  • UTC0703 “Strong Motion Instrumentation Plan for UDOT Bridges: Array Design, Typical Details, and Specifications,” Dr. Marvin Halling, PI. Co-funded by UDOT and UTC

  • UTC0702 "UDOT's Calibration of AASHTO's New Prestress Loss Design Equations," Dr. Paul Barr, PI. Co-funded by UDOT and UTC.

  • UTC0701 "Evaluation of Bridges for Seismic Retro,” Dr. Keri Ryan, PI.  Co-funded by the Utah Department of Transportation (UDOT) and UTC.

  • UTC1003 "Highway Wildlife Crossing Design Study," Dr. Patricia Cramer, PI. Funded by UTC.

  • UTC0803 "ABC Deck Connections, Laboratory Testing and Evaluation," Dr. Marvin Halling, PI. Co-funded by UDOT and UTC.